Contact

Hydroelectric peak shaving

StatusCurrent
Period2012 · 2026
AreaEnvironment & energy
Key figureBSc 2012, extended now

Dispatch scheduling to flatten demand peaks in a supply-constrained grid, now being extended with machine-learning methods.

Objectives

  1. Schedule hydroelectric dispatch to reduce severe load shedding in Bangladesh.
  2. Extend the dispatch work with machine-learning methods.

Methodology

Optimal peak-shaving operation of a hydroelectric power station (BSc thesis, 2012); machine-learning extension in preparation.